LNG
Nikkiso Secures Pump Delivery Contract for Brunsbüttel LNG Terminal
Equipment manufacturer Nikkiso CE&IG will deliver 16 submerged motor pumps to general contractor CS Gas North for the land-based LNG import facility in Brunsbüttel.

Cryogenic equipment provider Nikkiso Clean Energy & Industrial Gases Group has been awarded a contract by engineering contractor CS Gas North to supply 16 submerged motor pumps for a planned onshore liquefied natural gas import terminal located in Brunsbüttel, Germany. The delivery schedule covers high-pressure, low-pressure, and ship-loading units designed for the facility being developed by German LNG Terminal, as reported by Navingo BV’s Offshore Energy publication.
CS Gas North, an engineering, procurement, and construction joint venture established by COBRA Instalaciones y Servicios and SENER, is serving as the general contractor responsible for delivering the project. According to details reported by Offshore Energy, the Brunsbüttel facility will feature two primary storage tanks with an individual capacity of 165,000 cubic meters. Once commercial operations commence in 2027, the terminal is designed to deliver up to 10 billion cubic meters of gas annually into the German national pipeline network.
Beyond conventional LNG, the facility infrastructure is planned to handle bio-LNG and synthetic natural gas, with engineering provisions to accommodate lower-carbon fuels including hydrogen in the future. Ole Skatka-Jensen, Regional Vice-President for Europe, Middle East and Africa at Nikkiso CE&IG, stated in comments published by Offshore Energy that the Brunsbüttel project represents a critical component of Germany's energy framework due to its capability to handle both LNG and green gases alongside future hydrogen integration.
The contract expands Nikkiso's equipment footprint across Germany's developing import infrastructure for liquefied gases. It follows a prior award for the Hanseatic Energy Hub project in Stade, where the company agreed to supply 20 low-pressure and nine high-pressure pumps for what is planned to be the country's largest land-based terminal.
Source & editorial provenance
- Original source
- Navingo BVView source
- Source published
- 02 Sept 2026, 13:24 UTC
- Retrieved
- 03 Sept 2026, 10:32 UTC
- Navingo BV — Nikkiso lands equipment deal for German LNG terminalhttps://www.offshore-energy.biz/nikkiso-lands-equipment-deal-for-german-lng-terminal/
This article was drafted with AI assistance from the source material above, checked against the source for factual consistency and reviewed before publication. It is an independent editorial summary, not a reproduction of the source text.
Market context
Indicative levels, not a price assessment.
No market data source is currently connected. Configure a provider in the admin market data screen to display indicative levels.
More from this author
Crude Coast Desk
The Crude Coast Energy market desk compiles indicative price and market commentary from disclosed public sources.
All articles by Crude Coast DeskNewsletter
Crude Coast Energy — Market & Price Briefing
A concise daily read on crude, refined products, freight and energy trade — with every figure sourced and timestamped.